Is your production affected by formation damage from perforating?
Are you looking for a simple method of enhancing production from specific perforated zones?
SIM FloWell has been designed and developed by Peak to remove formation damage by inducing a sudden pressure drawdown in the wellbore to causes a surge of fluid inflow from the reservoir. This provides a simple, safer, low cost, and robust way to surge perforations when required.
Moreover, Peak's SIM plug systems can isolate zones of interest and, with the use of coiled tubing or capillary-style tubing intervention, can pump well flow enhancement fluids into these specific zones.
Stay Informed
Peak’s monthly newsletter, e-News, keeps you up-to-date with our latest product launches, upcoming events, technology developments and case studies.
If you would like to receive e-News, please submit your email address above: