Production Enhancement


Peak Well Systems aims to improve well productivity and our production enhancement products, which include choke systems and FloWell, are designed to improve fluid flow rate.

Deployed by any industry standard means (slickline, wireline, coiled tubing, drillpipe and tractor), these products can be set anywhere in the tubing for maximum flexibility.  Peak’s choke systems are used with plugs to control flow across different producing zones. FloWell has been designed to remove near wellbore damage (e.g. crush zones within perforation tunnels) in order to improve flow rate from the reservoir.