The telescoping space out joint reduces rig time and problems associated with completion space out, especially on subsea completions. The continous bore between upper and lower completions aids well intervention operations in deviated wells.
The joint is shipped in the closed position then, on the rig floor, the transport pins holding the joint closed can be removed and the telescoping space Out joint fully stroked open. Rated shear pins are then inserted which will be sheared out when the lower end of the telescoping space out joint lands off on the lower completion. The lower end can be supplied with various centralizer/mule shoe designs to suit particular applications.
Applications
Features & Benefits
Product Code: 600