Browse our collection of case studies to see our technology in action.
North Sea Well Access Restored Through Intelligent Wireline Intervention
Wellbore saved by using high-strength magnet to retrieve valve coupon, followed by active debris removal tool
Well-Safe Solutions Recovers 11,575 ft of Slickline Lost in a Well After 15 Years
Fish removal with Peak Well Systems, a Schlumberger company, allowed plug and abandonment of North Sea well
Collection of data with minimal pressure loss in flowing wells
A programmed platform was scheduled, providing an ideal opportunity to conduct valuable data acquisition operations
Contingency barrier option on high-value subsea wells
Peak’s SIM retrievable bridge plug was chosen as a contingency mechanical barrier to be employed if the nipple profile within the completion was unusa…
Recovery of magnetic junk in high temperature wells
Using a Peak 2.72-in OD high temperature/high strength magnet, clamp pieces were recovered in five tractor runs on e-line
Hard scale removal at multiple obstruction points
A net increase in production in excess of 14 MMscfd in the five wells where production increase was monitored was noted after using the Torque-Action …
Retrieval of equipment lost in the well and fast-track production restart
Recovery of high-cost rental tractor and mill assembly stuck in the well so that milling operations could be resumed and the well returned to producti…
High deviation, heavy-duty fishing, North Sea
Peaks innovative tools provide solution for recovering a bridge plug that had become stuck downhole
Recovery of safety valve lockout tool which had parted downhole
Expertise and high-performance tools enabled successful fishing on the first attempt
Retrieval of sub-surface safety valve (SSSV) with damaged fish neck
Peak's heavy-duty fishing tools used to retrieve fish
Retrieval of injection valve backed off from 7-in retrievable bridge plug
Crossover fished successfully with injection valve within six hours
Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger
The successful trial using SIM retrievable bridge plugs with micro coil will be of particular value to brownfield operators
Data acquisition to monitor pressure buildup in a shut-in well
The Peak eSetting tool, used exclusively with the Hi-Ex Gauge Hanger tool provided a reliable deployment technique without the need for pyrotechnics, …
Bespoke activation tool design
Peak tasked with designing a new tool to ensure the release of tubing conveyed perforating guns from the suspension system in highly deviated wells, e…
Evaluation of an e-line deployed tractor, stroker, and slickline toolstring
Test proves that Peak’s SIM plug’s can be run on e-line and mechanically set in horizontal completions using a third-party tractor and stroker to prov…
Trial test to remove hard scale from production tubing using mechanical means
Well accessibility was restored using the Torque-Action Debris Beaker tool - a simple slickline tool that reduces well intervention time and the costs…
Cut wire at rope socket to retrieve stuck toolstring
A timely and effective intervention was critical to allow the client to complete the well sidetrack once the wire was fished back to surface
Retrieval of injection valve from tubing crossover at 10,400 ft
A customer was retrieving a bridge plug and injection valve to surface when the injection valve separated from the plug and landed at the 5 1/2-in by …
High-deviation fishing at depth in the Middle East
Peak was able to address the problems attributed to the high deviation of the well by offering friction-reducing well intervention tools
Isolation of failed inflow valve at high deviation
The Peak SIM plug was specifically selected for this challenge, given the low setting forces of the SIM plug and the customers experience in deploying…
Location and stabilization of a leak path in the completion string
Peak provided an efficient and effective rigless solution, utilizing SIM sealing integrity management technology.
Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria
Efficient communication provided the client with a prompt and cost-effective solution
Efficient straddle solution enables repair of production Christmas tree
Full campaign completed without having to carry out any contingency operations or killing the well.
Permanent plug keeps P&A project moving
Nonexplosive tool setting for permanent bridge plug efficiently seals completion tubing for integrity test
Peak eCutter facilitates faster stuck toolstring recovery in long-reach, highly-deviated well
Peak eCutter and Pump Down Go-Devil avoid costly fishing job and keep drilling on schedule
Retrievable sand screen anchoring system eliminates leaks
Slickline configuration by Peak Well Systems avoids the need to run recompletion on well and reduces total service costs by 50%
Mechanical scale removal saves USD 250,000
Using Torque-Action Debris Breaker tool instead of coiled tubing operation significantly reduces well intervention time
PTTEP gas lift straddle conversion restores oil production for mature well
Rigless three-run slickline operation achieves production and economic goals, Gulf of Thailand
Slickline-deployed plug isolates damage to avoid workover
1,300-bbl/d production restored for KOC by installing SIM system retrievable bridge plug with LIVE digital slickline services
KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system
Leak detection tool and SIM sealing system identify and isolate tubing leak to prevent costly rig workover
D-Set setting tool and DSL digital slickline cable set large-bore gauge hanger in monobore well
Mechanical intervention technologies by Schlumberger and Peak Well Systems avoid cost of pulling first slickline unit for 22 days of measurements
Retrievable bridge plug enables proper tubing cut and saves 4 rig days, Congo
Rigless intervention reduces workover cost and mitigates risk
Remote Intervention Operation Enables Effective Planning of Plug and Abandonment Campaign
Fit-for-Purpose Intervention Tool Completes Remote Operation in a Single Run
Shell Removes 900-ft Parted Wireline from North Sea Well
Heavy-duty intervention during P&A operation completed over 4 days
Setting a Critical Well Barrier in Tubing with Damaged Nipple Profiles
The customer mitigated the potential risks and expense of the operation by opting for a 100% mechanical solution