North Sea Well Access Restored Through Intelligent Wireline Intervention Well-Safe Solutions Recovers 11,575 ft of Slickline Lost in a Well After 15 Years Collection of data with minimal pressure loss in flowing wells Contingency barrier option on high-value subsea wells Recovery of magnetic junk in high temperature wells Hard scale removal at multiple obstruction points Retrieval of equipment lost in the well and fast-track production restart High deviation, heavy-duty fishing, North Sea Recovery of safety valve lockout tool which had parted downhole Retrieval of sub-surface safety valve (SSSV) with damaged fish neck Retrieval of injection valve backed off from 7-in retrievable bridge plug Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger Data acquisition to monitor pressure buildup in a shut-in well Bespoke activation tool design Evaluation of an e-line deployed tractor, stroker, and slickline toolstring Trial test to remove hard scale from production tubing using mechanical means Cut wire at rope socket to retrieve stuck toolstring Retrieval of injection valve from tubing crossover at 10,400 ft High-deviation fishing at depth in the Middle East Isolation of failed inflow valve at high deviation Location and stabilization of a leak path in the completion string Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria > Efficient straddle solution enables repair of production Christmas tree Permanent plug keeps P&A project moving Peak eCutter facilitates faster stuck toolstring recovery in long-reach, highly-deviated well Retrievable sand screen anchoring system eliminates leaks Mechanical scale removal saves USD 250,000 PTTEP gas lift straddle conversion restores oil production for mature well Slickline-deployed plug isolates damage to avoid workover KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system D-Set setting tool and DSL digital slickline cable set large-bore gauge hanger in monobore well Retrievable bridge plug enables proper tubing cut and saves 4 rig days, Congo Remote Intervention Operation Enables Effective Planning of Plug and Abandonment Campaign Shell Removes 900-ft Parted Wireline from North Sea Well Setting a Critical Well Barrier in Tubing with Damaged Nipple Profiles

Efficient straddle solution enables repair of production Christmas tree

 

Location:

North West Shelf, Australia.

Customer:

Oil and gas company, Australia.

Well Type:

Gas producer; 7-in Christmas tree and completion.

Products/Services:

Bespoke Peak straddle system and eSetting tool; deployment by Peak field specialists.

The Challenge:

A customer required an innovative straddle solution to anchor and seal in a production Christmas tree above and below a leaking upper master gate valve (UMGV) stem seal to allow repairs to be undertaken.

Considerations:

The straddle was required to sit above the top of the lower master gate valve (LMGV) and below the bottom of the swab valve without causing damage; and it could not exceed 44 in in length.

A minimum straddle ID of 4.425 in was also required by the customer to enable them to run through and set a plug below the Christmas tree to isolate the well, and to provide the option to pump through to kill the well to perform a tree change-out in the event repairs could not be completed, or were delayed.

The operation would be subject to a working pressure of 3,000 psi, and an in-service temperature rating of 5 to 80 degC. The proposed solution was to meet the customer's
ISO 14310 V0 specification requirements.

Peak’s Solution:

Peak’s engineering team developed a solution to meet all the customer’s requirements within a short time frame; one that would isolate the UMGV to allow repair, and one that was soft set to ensure the LMGV would not be damaged during the operation.

The straddle solution was manufactured at Peak’s Perth facilities after which it underwent fluid testing before undergoing an SIT test. Further ISO 14310 nitrogen gas testing was conducted at Peak’s Aberdeen facilities to meet the customer’s zero-gas bubble (V0) validation criteria.

After a drift run to ensure no obstructions where present, the straddle was deployed via slickline by Peak’s field specialists and set using a modified version of Peak’s nonexplosive mechanical setting tool that provides a reliable deployment technique without the need for pyrotechnics, pressurised nitrogen or complex hydraulic pumps.

The setting tool was triggered using a pre-programmed electronic timer system and set the straddle on top of the LMGV without causing any damage. After repairs were made, the straddle was successfully retrieved and the campaign resumed.

Value to Customer:

The straddle was successfully set, enabling the customer’s maintenance crew to carry out the necessary repairs to the leaking UMGV, and complete the full campaign without having to carry out any contingency operations or killing the well.

The straddle solution is one that would fit three different production trees giving the customer the flexibility to use this solution for future operations if required.

 

Product Code(s): Straddle - A310