North Sea Well Access Restored Through Intelligent Wireline Intervention Well-Safe Solutions Recovers 11,575 ft of Slickline Lost in a Well After 15 Years Collection of data with minimal pressure loss in flowing wells Contingency barrier option on high-value subsea wells Recovery of magnetic junk in high temperature wells Hard scale removal at multiple obstruction points Retrieval of equipment lost in the well and fast-track production restart High deviation, heavy-duty fishing, North Sea Recovery of safety valve lockout tool which had parted downhole Retrieval of sub-surface safety valve (SSSV) with damaged fish neck Retrieval of injection valve backed off from 7-in retrievable bridge plug Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger Data acquisition to monitor pressure buildup in a shut-in well Bespoke activation tool design Evaluation of an e-line deployed tractor, stroker, and slickline toolstring Trial test to remove hard scale from production tubing using mechanical means Cut wire at rope socket to retrieve stuck toolstring Retrieval of injection valve from tubing crossover at 10,400 ft High-deviation fishing at depth in the Middle East Isolation of failed inflow valve at high deviation Location and stabilization of a leak path in the completion string Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria Efficient straddle solution enables repair of production Christmas tree Permanent plug keeps P&A project moving Peak eCutter facilitates faster stuck toolstring recovery in long-reach, highly-deviated well Retrievable sand screen anchoring system eliminates leaks Mechanical scale removal saves USD 250,000 PTTEP gas lift straddle conversion restores oil production for mature well Slickline-deployed plug isolates damage to avoid workover > KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system D-Set setting tool and DSL digital slickline cable set large-bore gauge hanger in monobore well Retrievable bridge plug enables proper tubing cut and saves 4 rig days, Congo Remote Intervention Operation Enables Effective Planning of Plug and Abandonment Campaign Shell Removes 900-ft Parted Wireline from North Sea Well Setting a Critical Well Barrier in Tubing with Damaged Nipple Profiles

KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system

Leak detection tool and SIM sealing system identify and isolate tubing leak to prevent costly rig workover.

Kuwait Oil Company (KOC) needed to determine the depth of and isolate a tubing leak to restore oil production in a well with an ESP completion. Peak Well Systems, a Schlumberger company, conveyed on digital slickline its leak detection tool and SIM sealing integrity management system to accurately detect and isolate the leak, avoiding a workover and returning production to 800 bbl/d with minimal economic impact.

ESP production challenges

Wells with ESP completions can be prone to tubing integrity issues. Fluid recirculation within the tubing can stop well production, and often a rig workover is then required to replace damaged tubing or leaks. This can result in well shutdown for at least 60 days, deferring production and increasing costs.

What Schlumberger recommended

A digital-slickline-conveyed straddle system—including Peak Well Systems’ leak detection tool and SIM system retrievable bridge plugs and straddle tubes—was used to accurately detect the depth of the leak and provide reliable zonal isolation.

How the straddle system restored production

The leak detection tool was deployed downhole using digital slickline to deliver downhole measurements to the surface in real time. The digital inline flowmeter accurately identified the leak within a 9-ft interval.

The Schlumberger team then ran 40 ft of stackable SIM system straddle tubes downhole between a lower and upper SIM system retrievable bridge plug to isolate the leakage and enable the well to resume production through the straddle, bypassing the leakage point.

Digital slickline accurately deployed the straddle system in five runs. After successful deployment, the ESP was started and wellhead pressure increased, immediately indicating that the leakage point had been isolated.

A GOR test showed the well producing oil at 800 bbl/d. Because of this unique intervention, KOC saved millions of dollars in deferred production as well as the costs associated with deploying a workover rig.

 

Product Code: 354