North Sea Well Access Restored Through Intelligent Wireline Intervention Well-Safe Solutions Recovers 11,575 ft of Slickline Lost in a Well After 15 Years > Collection of data with minimal pressure loss in flowing wells Contingency barrier option on high-value subsea wells Recovery of magnetic junk in high temperature wells Hard scale removal at multiple obstruction points Retrieval of equipment lost in the well and fast-track production restart High deviation, heavy-duty fishing, North Sea Recovery of safety valve lockout tool which had parted downhole Retrieval of sub-surface safety valve (SSSV) with damaged fish neck Retrieval of injection valve backed off from 7-in retrievable bridge plug Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger Data acquisition to monitor pressure buildup in a shut-in well Bespoke activation tool design Evaluation of an e-line deployed tractor, stroker, and slickline toolstring Trial test to remove hard scale from production tubing using mechanical means Cut wire at rope socket to retrieve stuck toolstring Retrieval of injection valve from tubing crossover at 10,400 ft High-deviation fishing at depth in the Middle East Isolation of failed inflow valve at high deviation Location and stabilization of a leak path in the completion string Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria Efficient straddle solution enables repair of production Christmas tree Permanent plug keeps P&A project moving Peak eCutter facilitates faster stuck toolstring recovery in long-reach, highly-deviated well Retrievable sand screen anchoring system eliminates leaks Mechanical scale removal saves USD 250,000 PTTEP gas lift straddle conversion restores oil production for mature well Slickline-deployed plug isolates damage to avoid workover KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system D-Set setting tool and DSL digital slickline cable set large-bore gauge hanger in monobore well Retrievable bridge plug enables proper tubing cut and saves 4 rig days, Congo Remote Intervention Operation Enables Effective Planning of Plug and Abandonment Campaign Shell Removes 900-ft Parted Wireline from North Sea Well Setting a Critical Well Barrier in Tubing with Damaged Nipple Profiles

Collection of data with minimal pressure loss in flowing wells

 

Technical Challenge:

Collection of data with minimal pressure loss in flowing wells

Peak Solution:

5 ½-in large bore gauge hanger and SIM running tool

Customer:

National oil company, offshore Malaysia

Well Type:

5 ½-in oil producer (74 degree deviation, 250-330 deg F)

The Challenge:

A programmed platform was scheduled, providing an ideal opportunity to conduct valuable data acquisition operations. Six wells across the field were strategically selected for pressure transient analysis.

Considerations:

The campaign offered some difficult working conditions - logistically and operationally. The following key requirements and concerns were highlighted by the customer:

  • Pinpoint data acquisition
  • Flow through capability
  • Restricted rig up height
  • Heightened safety concerns with use of explosives and nitrogen
  • Temperature limits on two of the six wells
  • POB capacity

Summary:

  • Six 5 ½-in large bore gauge hangers set on slickline at varying depths
  • Three gauges were connected to each gauge hanger
  • All gauge hangers successfully set for approximately four weeks duration
  • All gauge hangers successfully recovered on standard GS
  • All data recovered from gauges

Value to Customer:

  • Valuable data recovered for pressure transient analysis
  • Zero NPT
  • Zero harm to personnel
  • Significant cost savings

 