North Sea Well Access Restored Through Intelligent Wireline Intervention Well-Safe Solutions Recovers 11,575 ft of Slickline Lost in a Well After 15 Years Collection of data with minimal pressure loss in flowing wells Contingency barrier option on high-value subsea wells Recovery of magnetic junk in high temperature wells Hard scale removal at multiple obstruction points Retrieval of equipment lost in the well and fast-track production restart High deviation, heavy-duty fishing, North Sea Recovery of safety valve lockout tool which had parted downhole Retrieval of sub-surface safety valve (SSSV) with damaged fish neck Retrieval of injection valve backed off from 7-in retrievable bridge plug Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger Data acquisition to monitor pressure buildup in a shut-in well Bespoke activation tool design Evaluation of an e-line deployed tractor, stroker, and slickline toolstring Trial test to remove hard scale from production tubing using mechanical means Cut wire at rope socket to retrieve stuck toolstring Retrieval of injection valve from tubing crossover at 10,400 ft High-deviation fishing at depth in the Middle East Isolation of failed inflow valve at high deviation Location and stabilization of a leak path in the completion string > Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria Efficient straddle solution enables repair of production Christmas tree Permanent plug keeps P&A project moving Peak eCutter facilitates faster stuck toolstring recovery in long-reach, highly-deviated well Retrievable sand screen anchoring system eliminates leaks Mechanical scale removal saves USD 250,000 PTTEP gas lift straddle conversion restores oil production for mature well Slickline-deployed plug isolates damage to avoid workover KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system D-Set setting tool and DSL digital slickline cable set large-bore gauge hanger in monobore well Retrievable bridge plug enables proper tubing cut and saves 4 rig days, Congo Remote Intervention Operation Enables Effective Planning of Plug and Abandonment Campaign Shell Removes 900-ft Parted Wireline from North Sea Well Setting a Critical Well Barrier in Tubing with Damaged Nipple Profiles

Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria

 

Technical Objective:

Full workover avoided through innovative use of an LWIV to perform first subsea slickline intervention in Nigeria.

Location:

Offshore, Africa.

Customer:

National Oil Company.

Well Type:

Single string oil producer; 5 1/2-in, 17-lb casing.

Products/Services:

5 1/2-in SIM retrievable bridge plug and Boost running tool

The Challenge:

A customer experienced a tubing retrievable surface controlled subsurface safety valve (TRSCSSSV) failure on its subsea well at 951 m, with 7,000 bopd production locked in.

The objective was to offer a cost-effective solution which included setting a new type of valve in place of a full workover in a challenging subsea environment.

Considerations:

The TRSCSSSV is a safety valve system designed to be fail-safe and isolate the wellbore in the event of any system failure. Its malfunction in the ‘closed’ position had clear implications for well activity.

Ensuring well integrity was not compromised during the operation was a priority.

Peak’s Solution:

Peak collaborated with their Nigerian partner to support a light weight intervention vessel (LWIV) operation using slickline. LWIV costs are significantly less than a semi-submersible rig with no requirements for support vessels. 

Peak utilized the unique design of its SIM system to mechanically set (via slickline) a 5 1/2-in SIM retrievable bridge plug above the failed valve at 951 m using Peak’s Boost running tool.

The Boost running tool is activated by downward jarring which primes an inbuilt hydraulic chamber, creating an augmented high force output, to ensure the device is fully set. The tool automatically shears when the required setting force output is achieved, allowing the tool to be released from the device.

A spacer measuring 5.4 m, connected below the SIM plug, acted as the hold open device and an autonomous safety valve below the TRSCSSSV, completed the flow control package.

A successful inflow test was carried out ensuring well integrity was ascertained and the well was returned to full operation.

Value to Customer:

Efficient communication ensured Peak and their Nigerian partner worked competently to provide the client with a prompt and cost-effective solution.

The successful replacement of the valve (as an alternative to a full workover) and innovative use of an LWIV in Nigerian waters, to perform subsea slickline intervention, was significant.

 

Product Code(s): SIM retrievable bridge plug - 351; Boost running tool - 364