North Sea Well Access Restored Through Intelligent Wireline Intervention Well-Safe Solutions Recovers 11,575 ft of Slickline Lost in a Well After 15 Years Collection of data with minimal pressure loss in flowing wells Contingency barrier option on high-value subsea wells Recovery of magnetic junk in high temperature wells Hard scale removal at multiple obstruction points Retrieval of equipment lost in the well and fast-track production restart High deviation, heavy-duty fishing, North Sea Recovery of safety valve lockout tool which had parted downhole Retrieval of sub-surface safety valve (SSSV) with damaged fish neck Retrieval of injection valve backed off from 7-in retrievable bridge plug > Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger Data acquisition to monitor pressure buildup in a shut-in well Bespoke activation tool design Evaluation of an e-line deployed tractor, stroker, and slickline toolstring Trial test to remove hard scale from production tubing using mechanical means Cut wire at rope socket to retrieve stuck toolstring Retrieval of injection valve from tubing crossover at 10,400 ft High-deviation fishing at depth in the Middle East Isolation of failed inflow valve at high deviation Location and stabilization of a leak path in the completion string Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria Efficient straddle solution enables repair of production Christmas tree Permanent plug keeps P&A project moving Peak eCutter facilitates faster stuck toolstring recovery in long-reach, highly-deviated well Retrievable sand screen anchoring system eliminates leaks Mechanical scale removal saves USD 250,000 PTTEP gas lift straddle conversion restores oil production for mature well Slickline-deployed plug isolates damage to avoid workover KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system D-Set setting tool and DSL digital slickline cable set large-bore gauge hanger in monobore well Retrievable bridge plug enables proper tubing cut and saves 4 rig days, Congo Remote Intervention Operation Enables Effective Planning of Plug and Abandonment Campaign Shell Removes 900-ft Parted Wireline from North Sea Well Setting a Critical Well Barrier in Tubing with Damaged Nipple Profiles

Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger

 

Technical Challenge:

Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger for selective zonal isolation and treatment.

Well Type:

2 7/8-in training well.

Peak Solution:

Two 2 7/8-in SIM retrievable bridge plugs, SIM running tool, FlowThru’ check valve, latch/seal stinger together with 5/8-in micro coil.

Customer:

International oil company, training well Thailand

The Challenge:

The purpose of the trial was to confirm that micro coil and Peak SIM plugs could be used together to isolate a specific producing zone enabling treatment fluid to be injected into the zone. The treatment fluid could consist of stimulation fluid or water shut-off treatment.

Considerations:

The following key requirements and concerns were highlighted by the customer:

  • Ability to isolate producing zones
  • Micro coil to have the ability to latch and release from the Peak SIM plug
  • Emergency release features to be in place on micro coil tools
  • Check valve to prevent back flow when releasing

Summary:

The three day onshore trial was conducted in a training well.

Peak’s SIM retrievable bridge plug and prong were set as a barrier below the perforated interval of interest and a second SIM retrievable bridge plug fitted with a melon-type equalizing assembly and FlowThru’ check valve was set just above the perforated interval.

The micro coil was run into the well to stab the stinger-latch assembly into the upper SIM plug. Thereafter, treatment fluid was pumped through the coil into the isolated zone.

The dropball release function was checked - the ball pumped through the coil down to the stinger/latch to successfully release the micro coil from the upper SIM plug.

Testing of the emergency release feature of the micro coil stinger assembly was also conducted - the FlowThru’ check valve maintained pressure against the formation when the micro coil was disconnected and prevented the coil being blown up hole.

Value to Customer:

The successful trial using SIM retrievable bridge plugs with micro coil will be of particular value to brownfield operators:

  • A small footprint: cost effective means to isolate, stimulate and clean the producing sandface
  • Ease of deployment
  • Enhances performance of FloWell - to remove formation damage and improve well productivity
  • Ascertained that the micro coil could stab into the upper SIM plug successfully

 