North Sea Well Access Restored Through Intelligent Wireline Intervention Well-Safe Solutions Recovers 11,575 ft of Slickline Lost in a Well After 15 Years Collection of data with minimal pressure loss in flowing wells Contingency barrier option on high-value subsea wells Recovery of magnetic junk in high temperature wells Hard scale removal at multiple obstruction points Retrieval of equipment lost in the well and fast-track production restart High deviation, heavy-duty fishing, North Sea Recovery of safety valve lockout tool which had parted downhole Retrieval of sub-surface safety valve (SSSV) with damaged fish neck Retrieval of injection valve backed off from 7-in retrievable bridge plug Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger Data acquisition to monitor pressure buildup in a shut-in well Bespoke activation tool design Evaluation of an e-line deployed tractor, stroker, and slickline toolstring > Trial test to remove hard scale from production tubing using mechanical means Cut wire at rope socket to retrieve stuck toolstring Retrieval of injection valve from tubing crossover at 10,400 ft High-deviation fishing at depth in the Middle East Isolation of failed inflow valve at high deviation Location and stabilization of a leak path in the completion string Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria Efficient straddle solution enables repair of production Christmas tree Permanent plug keeps P&A project moving Peak eCutter facilitates faster stuck toolstring recovery in long-reach, highly-deviated well Retrievable sand screen anchoring system eliminates leaks Mechanical scale removal saves USD 250,000 PTTEP gas lift straddle conversion restores oil production for mature well Slickline-deployed plug isolates damage to avoid workover KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system D-Set setting tool and DSL digital slickline cable set large-bore gauge hanger in monobore well Retrievable bridge plug enables proper tubing cut and saves 4 rig days, Congo Remote Intervention Operation Enables Effective Planning of Plug and Abandonment Campaign Shell Removes 900-ft Parted Wireline from North Sea Well Setting a Critical Well Barrier in Tubing with Damaged Nipple Profiles

Trial test to remove hard scale from production tubing using mechanical means

 

Technical Objective:

To conduct a trial test to remove hard scale from production tubing using mechanical means to restore full bore access.

Well type:

Vertical oil well, 4 1/2-in tubing size.

Peak Solution:

Peak Torque-Action Debris Breaker wellbore clanup and debris removal tool: 2 1/2-in torque mandrel with 3.70-in and 3.83-in cutter subs.

The Challenge:

During a drift run in 2013, a customer detected accumulated scale in the production tubing of an oil well. The well had a history of scale buildup and a previous downhole solid sample presented 95 per cent iron compounds – iron oxide, siderite, mackinawite, and pyrrohtite as well as calcium carbonate.

Several attempts at acid descaling using 15 per cent and 20 per cent Hydrogen Chloride (HCl) yielded moderate results but it was unable to fully clear the obstructions just below surface.

Scale left in the completion as a bridge was not acceptable to the customer and a trial test was proposed to attempt to break the hard scale using mechanical means.

Considerations:

The following key requirements and concerns were highlighted:

  • A timely and effective intervention was critical
  • A mechanical means of descaling was required
  • The solution needed to be simple and easy to perform

Summary:

A trial test of Peak’s Torque-Action Debris Breaker tool was initiated to remove the hard scale in 4 1/2-in production tubing.

A 3.83-in Torque-Action Debris Breaker tool was run in hole and tagged an obstruction at 450 ftkb. The tool was jarred down mechanically in the well using 10 ft of 1.875-in toolstring. With each downward jar, the unique helically split torque sub applied a short duration of rotational torque to the cutter below clearing 30 ft of obstruction to reach 512 ftkb. Further jarring cleared this obstruction and continued to 539 ftkb. A smaller 3.7-in OD cutter was then run in hole.

Many areas of tight and hard scale were consistently cleared at a rate of 3,000 ft/hr until the crossover was reached at 6,770 ftkb.

The 3.83-in Torque-Action Debris Breaker tool was re-run in hole with 5 ft of 1.875 in additional stem for added weight and continued to clear the scale to 1,350 ftkb before the trial was ended.

The hard scale was successfully cleared using the Torque-Action Debris Breaker tool where previous acidizing attempts were not as successful.

Value to Customer:

The trial was declared a success by the customer with all operations carried out safely and efficiently.

  • The operation demonstrated a future time and cost saving - eliminating the need for additional costs associated with an acidizing operation
  • Well accessibility was restored using a simple slickline tool that reduced well intervention time and the costs associated with other mechanical scale removal methods ie CT milling
  • Less personnel and equipment were required
  • Well potential and integrity was restored quicker than alternative methods

 