North Sea Well Access Restored Through Intelligent Wireline Intervention Well-Safe Solutions Recovers 11,575 ft of Slickline Lost in a Well After 15 Years Collection of data with minimal pressure loss in flowing wells Contingency barrier option on high-value subsea wells Recovery of magnetic junk in high temperature wells Hard scale removal at multiple obstruction points Retrieval of equipment lost in the well and fast-track production restart High deviation, heavy-duty fishing, North Sea Recovery of safety valve lockout tool which had parted downhole Retrieval of sub-surface safety valve (SSSV) with damaged fish neck > Retrieval of injection valve backed off from 7-in retrievable bridge plug Trial deployment of slickline-set SIM plugs and Peak latch/seal micro coil stinger Data acquisition to monitor pressure buildup in a shut-in well Bespoke activation tool design Evaluation of an e-line deployed tractor, stroker, and slickline toolstring Trial test to remove hard scale from production tubing using mechanical means Cut wire at rope socket to retrieve stuck toolstring Retrieval of injection valve from tubing crossover at 10,400 ft High-deviation fishing at depth in the Middle East Isolation of failed inflow valve at high deviation Location and stabilization of a leak path in the completion string Innovative use of an LWIV to perform first subsea slickline intervention in Nigeria Efficient straddle solution enables repair of production Christmas tree Permanent plug keeps P&A project moving Peak eCutter facilitates faster stuck toolstring recovery in long-reach, highly-deviated well Retrievable sand screen anchoring system eliminates leaks Mechanical scale removal saves USD 250,000 PTTEP gas lift straddle conversion restores oil production for mature well Slickline-deployed plug isolates damage to avoid workover KOC restores oil production to 800 bbl/d using digital-slickline-conveyed straddle system D-Set setting tool and DSL digital slickline cable set large-bore gauge hanger in monobore well Retrievable bridge plug enables proper tubing cut and saves 4 rig days, Congo Remote Intervention Operation Enables Effective Planning of Plug and Abandonment Campaign Shell Removes 900-ft Parted Wireline from North Sea Well Setting a Critical Well Barrier in Tubing with Damaged Nipple Profiles

Retrieval of injection valve backed off from 7-in retrievable bridge plug

 

Technical Challenge:

Retrieval of injection valve backed off from 7-in retrievable bridge plug.

Well Type:

Water injector (maximum 40 degrees deviation).

Peak Solution:

4.5-in OD heavy-duty releasable spear.

Customer:

UK-based operator, North Sea

The Challenge:

In March 2015, wireline was deployed to pull the 7-in retrievable bridge plug (RBP) complete with injection valve to surface. Once pulled to surface it was noticed that the injection valve with crossover had backed off downhole.

The injection valve and crossover were located at 9,901 ft between the 7-in to 5 ½-in completion crossover. A method to fish the injection valve and crossover to allow a new injection valve to be installed was required.

Considerations:

The following key requirements and concerns were identified:

  • A timely and effective intervention was critical to allow the new injection valve to be installed to minimize impact on linked production wells
  • Onshore trial to determine how the injection valve and crossover could be fished was to be conducted within hours of the issue arising

Summary:

During the onshore trial it was established that the crossover could only be located at the smaller ID where it would make contact with the poppet of the injection valve. The injection valve required 125 lbs minimum force to compress the poppet and the full travel to open the injection valve was 5.52 in. With the poppet fully compressed this would allow the Peak releasable spear to locate the inner ID on the crossover.

Following rapid mobilization of Peak’s 4.5-in OD heavy-duty releasable spear to the offshore platform it was successfully run in hole to the location of the crossover at 9,901 ft. After the latching process the pick-up weight increased 100 lbs confirming the 4.5-in OD heavy-duty Rrleasable spear had a grip of the injection valve.

Upon returning to surface it was noted by the operator that the injection valve was externally damaged and there was clear evidence of debris which was brought back to surface.

Value to Customer:

All operations were carried out safely and efficiently, minimizing the period of reduced production from linked production wells.

  • Onshore trials were carried out immediately to confirm forward plan
  • Mobilized to offshore platform within eight hours
  • Upon arriving at the platform the tools were run in hole without issue and successfully fished the crossover complete with injection valve within six hours
  • New RBP and injection valve now set and full injection available
  • Operational support ensured that the customer received the best possible support

 